0102030405
China Suppliers Factory for Large Skateboard Conveyor Line Systems: Elevators, Transport Rails & More
Parameter Description
| Serial Number | Name (of a thing) | Unit (of measure) | Parameters |
|---|---|---|---|
| 1 | Center distance between head and tail of line body | mm | 30000-300000 |
| 2 | Process speed | m/min | 2.9~30m/min |
| 3 | Mode of operation | continuous operation | |
| 4 | Distance between workstations | mm | 2000-5900 |
| 5 | Effective workstation | Pcs | 66 |
| 6 | Skateboard Size | mm | 5900x3000x250 |
| 7 | Elevation of the top of the skateboard | mm | ±0.00 |
| 8 | Individual adapter beats | S | ≤51 |
Product Description
The structure of the large skateboard conveyor line is very adaptable and the cost is lower than conveyor lines with similar functions. Therefore, many automobile assembly workshops currently use the large skateboard conveyor system, which has gradually become a mainstream equipment in the field of automobile production. The design quality of the large skateboard conveyor line determines the performance of the conveyor line, including conveying speed, load capacity, etc., which are all important parameters to consider. It is necessary to determine the operation capacity of the large skateboard conveyor line based on workshop production performance and minimize damage to the large skateboard conveyor line probability and improve construction safety. This is also the most basic requirement for the design of large skateboard conveyor lines.
The large skateboard conveyor line system contains a variety of structures, including large skateboards, transport rails, drive structures, slewing systems, lifting systems (elevators and lifting platforms), track locking, skateboard inspection tools, maintenance trolleys, etc. In the design of the line system, the design plan must be input first. The computer software calculates the main line conveying speed, selects the head-to-tail double line transfer form according to the speed, calculates the length of the fast drive section, matches the number of drive motors, and checks the automatic drive motor, fast drive motor, Selection and verification of lift motors, rotary table motors, and scissor lift table motors, determining the workstation of each equipment, determining the number of transition plates, selecting the appropriate conveyor line length and track spacing, selecting track models, and calculating skateboards Check the strength of the roller shaft and check it to make sure that the strength of the elevator belt and column can meet the standards.
Frequently Asked Questions (FAQ)
Why is the large skateboard conveyor system widely used in automobile assembly?
It is highly adaptable and offers a lower cost compared to other conveyor systems with similar functions, making it a mainstream choice for modern automotive production lines.
What is the typical processing speed of the skateboard conveyor line?
The system supports a flexible process speed range of 2.9 to 30 meters per minute, depending on specific production requirements.
What core components are included in the conveyor line system?
The system consists of large skateboards, transport rails, drive structures, slewing systems, lifting systems (elevators and scissor lift tables), track locking mechanisms, inspection tools, and maintenance trolleys.
How do designers ensure safety and minimize damage to the system?
Designers determine the operation capacity based on workshop performance requirements, calculate line speeds and component strengths via specialized software, and verify the load limits of roller shafts, elevator belts, and columns.
What are the standard dimensions of the conveyor skateboard?
The standard skateboard size is 5900 x 3000 x 250 mm, with a top elevation design point of ±0.00 mm.